Test Scenarios of Lift

  1. Verify the dimensions of the lift.
  2. Verify the type of door of the lift is as per the specification.
  3. Verify the type of metal used in the lift interior and exterior.
  4. Verify the capacity of the lift in terms of the total weight.

What are the test cases for elevator?

Elevator Test cases

  • Elevator is capable of moving up and down.
  • It is stopping at each floor.
  • It moves exactly to that floor when corresponding floor no is pressed.
  • It moves up when called from upward and down when called from downward.
  • It waits until ‘close’ button is pressed.

How would you test elevator?

Functional Tests

  1. The lift should move in an upward direction when the number is pressed greater than the floor number it is presently on.
  2. The lift should move in a downward direction when the number is pressed lesser than the floor number it is presently on.
  3. Lift when empty, should not move.

How do you write tests in use cases?

Create test cases that are as simple as possible. They must be clear and concise as the author of the test case may not execute them. Use assertive language like go to the home page, enter data, click on this and so on. This makes the understanding the test steps easy and tests execution faster.

How do you write a test case for a fan?

Test Cases for Fan

  1. Check the type of fan – whether the fan is ceiling fan or table fan.
  2. Verify the number of blades on the fan.
  3. Verify the ON-OFF functionality of fan.
  4. Verify if the fan works normally-throws wind on the right direction.
  5. Verify the material of which fan’s blade and other parts are made.

What is smoke and sanity testing?

Smoke Testing is a type of testing which is done to assure that the acute functionalities of program is working fine. Sanity testing is done to check the bugs have been fixed after the build. Smoke testing is also called subset of acceptance testing. Sanity testing is also called subset of regression testing.

How do you write end to end test cases?

Key Steps in Setting up End-to-End Tests:

  1. Review the requirements you’ll be using end-to-end testing to validate.
  2. Set up the test environments and outline the hardware /software requirements.
  3. Define all the processes of your systems and its integrated subsystems.
  4. Describe the roles and responsibilities for each system.

What is in a test plan?

A Test Plan refers to a detailed document that catalogs the test strategy, objectives, schedule, estimations, deadlines, and the resources required for completing that particular project. Think of it as a blueprint for running the tests needed to ensure the software is working properly – controlled by test managers.