How long is the Millbury bike trail?

2.5 miles
Starting at the northern end of the Blackstone River Valley National Heritage Corridor, the Worcester, MA, to Millbury, MA, segment is 2.5 miles long, starting at the Blackstone River Valley Heritage Center at Worcester (3 Paul Clancy Way).

How long is the Blackstone Valley Greenway?

48-mile
The Blackstone River Greenway (formerly Bikeway) is a partially completed 48-mile (77 km) paved rail trail defining the course of the East Coast Greenway through the Blackstone Valley from Worcester, Massachusetts to Providence, Rhode Island.

How many miles is the Blackstone River?

77 km
Blackstone River/Length

Is the Blackstone River clean?

Pollution and remediation efforts By 1900 the river was already considered polluted and the Massachusetts Department of Public Health said in a report, “The Department finds that the condition of the Blackstone River is offensive throughout its course, from Worcester to the state line at Blackstone.

What fish are in the Blackstone River?

Today, according to the Blackstone River Coalition, there 37 species:

  • Alewife. American Brook Lamprey. American Eel. Banded Killifish. Banded Sunfish. Black Crappie.
  • Chain Pickerel. Channel Catfish. Common Carp. Common Shiner. Creek Chubsucker. Fallfish.
  • Rainbow Smelt. Rainbow Trout. Redfin Pickerel. Rock Bass. Smallmouth Bass.

Is the Blackstone River safe to swim in?

The Blackstone River has come a long way, but, it is still not considered safe to swim in the River or to consume fish from the River. However, it is safe for canoeing and kayaking.

Is the Mass Central Rail Trail paved?

The trail is fully complete and paved through Northampton. The 5-mile (8.0 km) section west of downtown is managed by the City of Northampton.

How long is the Bruce Freeman rail trail?

11.7 miles
The trail is 11.7 miles long (From Lowell to the current terminus in Acton). A section of the trail (2.5 miles) is now opened in Concord and will eventually connect to the Action Trail with a bridge (Phase 2B) over Route 2.

Where is the Blackstone River Greenway in Massachusetts?

In Massachusetts, the Blackstone River Greenway is being planned, designed and constructed in seven (7) separate segments running from the Rhode Island border through Blackstone, Millville, Uxbridge, Northbridge, Grafton, Sutton, Millbury and Worcester. Gravel, graded surface. Some sections have been impacted by flooding and wetness.

Where does the Blackstone River Trail End in Millbury?

The trail continues to follow the railroad as you move toward the center of Millbury. One last underpass and a bend in the trail put you along Main Street and back across the river. The trail follows Main Street and ends at a small parking lot just off the road.

Is there a bikeway along the Blackstone River?

The Blackstone River Greenway was conceived of as including a 48-mile long bikeway connecting Worcester, MA, to Providence, RI. Running the length of the National Heritage Corridor, the bikeway would follow along the Blackstone River and/or Canal wherever possible.

Where is the Blackstone River Heritage Center in Worcester MA?

Starting at the northern end of the Blackstone River Valley National Heritage Corridor, the Worcester, MA, to Millbury, MA, segment is 2.5 miles long, starting at the Blackstone River Valley Heritage Center at Worcester (3 Paul Clancy Way).